A major chemical project in Singapore

A challenge of scale and precision as a SPMT (Self-Propelled Modular Trailer) was used to ensure low road vibration on the road to haul and deliver the modules alongside the heavy lift vessel M/V Fairlane.

Our seamless transition from the fabrication site in Sattahip, Thailand, to the final destination on Jurong island in Singapore demanded an error-free journey due to the high sensitivity of the cargo and the necessity for perfect assembly on site.