With a cargo of 30 boiler modules and two HP drums of up to 200 metric tons each, FLS could not access the site by road. We had to envision detailed logistical concept that involved the construction of a purpose-built jetty close to site, in the mouth of a river close to the ocean. We… Continue reading Chana Power Plant
Industry: Power
Global control tower operations
FLS Role: Being the single contact for all the customer’s global logistics needs – Providing 24/7/365 hands-on global customer service via our base in Thailand – Follow-up with the customer’s supplier globally for the production progress and finishing schedules and reporting any possibility for delays – Coordinating with the customer’s suppliers for a timely dispatch… Continue reading Global control tower operations
700MT BIO POWER MEGA UNIT
Our FLS team in Australia chartered a suitable geared multi-purpose heavy lift vessel in order to coordinate and execute the FAS delivery, loading and securing to the vessel of two Bio Power units with volumes of 36 x 18.3 x 8.3 m / 700 MT and 13.2 x 9.2 x 5.56 m / 61 MT… Continue reading 700MT BIO POWER MEGA UNIT