A smooth delivery for the sustainable energy industry

FLS Projects moved over-dimensional wind turbine blades in a smooth delivery for the substainable energy industry

Delivering 3,768 CBM cargo on short notice – not a problem! Close coordination with partners to arrange proper trucks and trailers that follow strict technical requirements – we can handle it! Timely response to avoid a five-day port congestion delay by finding the right berthing window to discharge the cargo in 6 hours – we… Continue reading A smooth delivery for the sustainable energy industry

A crucial project to welcome the G20 Summit 2022

Completed with the pinpoint precision on the tramway

It is always our great honour to complete projects that benefit countries and international relations. Recently, FLS Projects was assigned the delivery of two trams for the famous theme park, Taman Mini Indonesia Indah (The Miniatures of Wonders of Indonesia) ready for the 17th G20 Summit. Following a smooth delivery from Madiun, Java, our experts… Continue reading A crucial project to welcome the G20 Summit 2022

575 MT Fishing Trawler Loading

FLS not only chartered a suitable heavy lift vessel in accordance with the client’s requirements but also was heavily involved in all arrangements prior and during loading: Special steel cradles accommodating the unique hull shape were fabricated according to the design of our in-house engineer. Also, FLS’ stevedoring team positioned the heavy cradles in the… Continue reading 575 MT Fishing Trawler Loading

MINING-EQUIPMENT and MACHINERY

FLS’ scope was not just the loading but also included dismantling buckets, arms, and counterweights before loading the machinery onto the vessel.  Our experienced Project Manager guided the stevedores for the handling of the heavy-lift operations whilst precisely following the stowage plan. A major element to ensure a timely and smooth operation at the port… Continue reading MINING-EQUIPMENT and MACHINERY

Chana Power Plant

With a cargo of 30 boiler modules and two HP drums of up to 200 metric tons each, FLS could not access the site by road. We had to envision detailed logistical concept that involved the construction of a purpose-built jetty close to site, in the mouth of a river close to the ocean. We… Continue reading Chana Power Plant

Rheinmetall NIOA Munitions Delivery

In Maryborough, Queensland, Australia, we coordinated the local delivery of two large breakbulk units including the main 115 tons forge and associated containerized components for the Rheinmetall NIOA Munitions Project. Successful completion required precise cooperation between several parties and will bring over 100 jobs to help develop the sovereign capability for the Australian Defense Force.… Continue reading Rheinmetall NIOA Munitions Delivery