Delivering 3,768 CBM cargo on short notice – not a problem! Close coordination with partners to arrange proper trucks and trailers that follow strict technical requirements – we can handle it! Timely response to avoid a five-day port congestion delay by finding the right berthing window to discharge the cargo in 6 hours – we… Continue reading A smooth delivery for the sustainable energy industry
Capability: Projects
A crucial project to welcome the G20 Summit 2022
It is always our great honour to complete projects that benefit countries and international relations. Recently, FLS Projects was assigned the delivery of two trams for the famous theme park, Taman Mini Indonesia Indah (The Miniatures of Wonders of Indonesia) ready for the 17th G20 Summit. Following a smooth delivery from Madiun, Java, our experts… Continue reading A crucial project to welcome the G20 Summit 2022
Delivering two Cape-class Patrol boats for Trinidad and Tobago Coast Guard
Every project is important to us and many are crucial to the countries they benefit too. In late May this year FLS Vietnam was proud to deliver two new Cape-class Patrol Boats for the Trinidad and Tobago Coast Guard. Built by Austal Australia, a specialist in naval ships and patrol boats, our main challenge was… Continue reading Delivering two Cape-class Patrol boats for Trinidad and Tobago Coast Guard
575 MT Fishing Trawler Loading
FLS not only chartered a suitable heavy lift vessel in accordance with the client’s requirements but also was heavily involved in all arrangements prior and during loading: Special steel cradles accommodating the unique hull shape were fabricated according to the design of our in-house engineer. Also, FLS’ stevedoring team positioned the heavy cradles in the… Continue reading 575 MT Fishing Trawler Loading
MINING-EQUIPMENT and MACHINERY
FLS’ scope was not just the loading but also included dismantling buckets, arms, and counterweights before loading the machinery onto the vessel. Our experienced Project Manager guided the stevedores for the handling of the heavy-lift operations whilst precisely following the stowage plan. A major element to ensure a timely and smooth operation at the port… Continue reading MINING-EQUIPMENT and MACHINERY
Chana Power Plant
With a cargo of 30 boiler modules and two HP drums of up to 200 metric tons each, FLS could not access the site by road. We had to envision detailed logistical concept that involved the construction of a purpose-built jetty close to site, in the mouth of a river close to the ocean. We… Continue reading Chana Power Plant
Ferry Loading and Shipment of two catamarans
Each Catamaran had a net weight of 200MT, and measured 55m in length, 16m in width and 16m in height. We arranged a temporary steaming license as well as ocean freight including loading and discharging. It took approximately two months of preparation work to smoothly coordinate the operation with the tug owner to keep the… Continue reading Ferry Loading and Shipment of two catamarans
1,500 MT radial quadrant ship loader
It took FLS Vietnam precision, patience and planning to move the gigantic 1,500 ton shiploader from erection site to alongside vessel. FLS Projects Vietnam has been engaged to get the giant in motion for the first time since erection began more than two years ago. Over this period of time countless parts and components had… Continue reading 1,500 MT radial quadrant ship loader
Rheinmetall NIOA Munitions Delivery
In Maryborough, Queensland, Australia, we coordinated the local delivery of two large breakbulk units including the main 115 tons forge and associated containerized components for the Rheinmetall NIOA Munitions Project. Successful completion required precise cooperation between several parties and will bring over 100 jobs to help develop the sovereign capability for the Australian Defense Force.… Continue reading Rheinmetall NIOA Munitions Delivery
A major chemical project in Singapore
A challenge of scale and precision as a SPMT (Self-Propelled Modular Trailer) was used to ensure low road vibration on the road to haul and deliver the modules alongside the heavy lift vessel M/V Fairlane. Our seamless transition from the fabrication site in Sattahip, Thailand, to the final destination on Jurong island in Singapore demanded… Continue reading A major chemical project in Singapore